Power Interruption Schedule

Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


MARCH 14-15, 2026 (SATURDAY & SUNDAY)


8:00 AM TO 5:00 PM


Bindoy Line Section: Sitio Cansunog to Sit. Sook & Sitios of Brgy. Nalundan (Pagsal-Ayon, Bayog, Abaca & Cutad)


1. Necessary shutdown due to bridge construction to ensure safe concrete girder launching and crane lifting operation c/o gram construction and supply.
DATE POSTED: MARCH 11, 2026


Image from link EMERGENCY POWER INTERRUPTION UPDATE
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 20, 2026 (FRIDAY)


10:00 AM – 5:00 PM


Affected Equipment:
Guihulngan Substation – Feeder 1 (Buenavista Cut-Out)

Affected Areas:
Brgy. Magsaysay, Plagatasanon, Balogo, Banwague, Linantuyan, Luz, Hinakpan, Nagsaha, Villegas, Planas, Humay-humay, and portions of Brgy. Buenavista


1. Vegetation clearing along the Buenavista–Magsaysay line section

2. Conversion from single-phase to vee-phase, including line sectioning to redistribute load for upland barangays and reduce the coverage of future power interruptions

3. Other necessary preventive maintenance activities to improve system reliability
DATE POSTED: FEBRUARY 20, 2026


Image from link EMERGENCY POWER INTERRUPTION UPDATE
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 18, 2026 (WEDNESDAY)


3:45 PM


Affected Equipment:
Guihulngan Substation - Feeder 2 Recloser

Affected Areas:
From Poblacion, Guihulngan City up to Bae, Jimalalud


Reinforcement of a cut jumper wire at Tuway, P. Zamora.
DATE POSTED: FEBRUARY 18, 2026


Image from link SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 21, 2026 (SATURDAY)


7:30 AM - 5:00 PM


Bais City Line Section: Portion of Brgy. 2 (From Brgy. Hall, Obrero to San Jose), Dewey Island, (Brgy. Capiñahan, Brgy. Looc, Brgy. Okiot, Bais City), NORSU


1. Relocation of 3 poles due to bridge construction at Brgy.II, Bais City (ITM1272)

2. Massive line clearing.

3. Other maintenance activities.
DATE POSTED: FEBRUARY 18, 2026


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 18, 2026 (WEDNESDAY)


9:39 AM


EQUIPMENT AFFECTED: Feeder 1

AREAS AFFECTED:
Portion of Poblacion Bais
Brgy. 2
Brgy. Looc
Brgy. Okiot
Brgy. Capinahan
Brgy. Olympia
Brgy. Talungon
Brgy. San Isidro
Brgy. Tangculogan
Brgy. Binohon
Brgy. Valencia
Brgy. Katacgahan
Brgy. Tamisu
Brgy. Manlipac
Brgy. Tagpo
Portion of Riverside, Alangilanan
URSUMCO
City Treasurer Office
Mayor Office
S.P. Session Hall
Bais City District Hospital (50 kva transformer)




Feeder 1 protection device has tripped off. We will conduct line inspection.
DATE POSTED: FEBRUARY 18, 2026


Image from link SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 19, 2026 (THURSDAY)


10:00 AM - 3:00 PM


Mabinay Line Section: Brgy. Abis, Bato, Samac, Pandanon, Dahile, Hagtu, Mabinay.

Bindoy Line Section: Sitio Capipines, Brgy. Nalundan(Abaca, Bayog,Pagsalayon, Kalatagan, & Mantahao)

Ayungon Line Section: Brgy. Mabato, Carol-An.

Manjuyod Line Section: Brgy. Kauswagan




1. Replacement of a deteriorated primary pole that posed a safely risk to the public. The replacement is necessary to prevent potential accidents.

2. Line clearing activities.

3. Other maintenance activities.
DATE POSTED: FEBRUARY 16, 2026


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 13, 2026 (FRIDAY)


11:50 AM


EQUIPMENT: Calasgaan Primary Line Section

AREAS AFFECTED: AREAS AFFECTED: Brgy. Mansangaban, Bais




Ensure the safety of rescuers during the lifting and retrieval operations of the LGU dump truck that fell into the ravine. (Continuation)
DATE POSTED: FEBRUARY 13, 2026


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 12, 2026 (THURSDAY)


10: AM - 2:00 PM


EQUIPMENT: Calasgaan Primary Line Section

AREAS AFFECTED: Brgy. Mansangaban, Bais




Ensure the safety of rescuers during the lifting and retrieval operations of the LGU dump truck that fell into the ravine.
DATE POSTED: FEBRUARY 12, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 15, 2026 (SUNDAY)


8:00 AM - 4:00 PM


Mabinay Line Section: Brgy. Poblacion, Mabinay (Purok 1), Mabinay Spring, Bais City Mabinay Water District, Mabinay Central School.




1. Massive line clearing will be conducted along Población, Mabinay to remove trees obstructing the distribution line and nearby residentials areas, Hence their removal is necessary to prevent accidents service interruptions and potential hazards.
DATE POSTED: FEBRUARY 10, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 15, 2026 (SUNDAY)


9:00 AM - 4:00 PM


Bais City Line Section: Portion Of Mabini St., (3phase Line From Bpi To La Planta), EC Villanueva St., La Consolacio College, Lgu's Annex Bldg., Evacuation Center, City Water Works, Hall Of Justice, BDO, La Planta, BPI.




1. Installation of 3-37.5kva transformer to serve La Consolacion College at E.C. Villanueva St., Bais City (ITM 1261)

2. Line installation to serve La Consolacion College (ITM 1260)

3. Line clearing and other maintenance activities.
DATE POSTED: FEBRUARY 10, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 14, 2026 (SATURDAY)


7:00 AM - 5:00 PM


Guihulngan City Line Section: Portion Of Brgy. Poblacion, T-Beach, Mckinley, Kagawasan, Bakid.

La Libertad: All Barangays

Jimalalud: All Barangays (Except Brgy. Talamban)




1. Implementation of applied ITM no. 1259 pole relocation at Looc, Población, Guihulngan City.

2. Implementation of applied ITM no. 1273 and 1274, pole and transformer installation at Brgy. Polopantao, Jimalalud.

3. Line clearing along Pisong to Cantupa line Section.

4. Other preventive maintenance activities in the area.
DATE POSTED: FEBRUARY 10, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 7, 2026 (SATURDAY)


9:00AM - 4:00PM


Bais City Line Section: Portion Of Mabini St., ( 3phase Line From Bpi To La Planta), Ec Villanueva St., La Consolacio College, Lgu's Annex Bldg., Evacuation Center, City Water Works, Hall Of Justice, BDO, La Planta, BPI.




1. Installation of 3-37.5kva transformer to serve La Consolacion College at E.C. Villanueva St., Bais City (ITM 1261)

2. Line installation to serve La Consolacion College (ITM 1260)

3. Line clearing and other maintenance activities.
DATE POSTED: FEBRUARY 4, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


FEBRUARY 5, 2026 (THURSDAY)


9:00AM - 5:00PM


Guihulngan City Line Section: Portion of Brgy. Poblacion, T-Beach, Mckinley, Kagawasan, Bakid.

La Libertad: All Barangays

Jimalalud : All Barangays (Except Brgy. Talamban)




1. Implementation of applied ITM no. 1259 pole relocation at Looc, Población, Guihulngan City.

2. Implementation of applied ITM no. 1273 and 1274, pole and transformer installation at Brgy. Polopantao, Jimalalud.

3. Line clearing along Pisong to Cantupa line Section.

4. Other preventive maintenance activities in the area.
DATE POSTED: FEBRUARY 3, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 31, 2026 (SATURDAY)


7:00 AM - 5:00 PM


Whole Coverage Area Of: Canlaon City

Vallehermoso Line Section: Portion Of Brgy. Tagbino




1. Replacement of toppled 2-C7 pole structure at Panubigan, Canlaon City near transloading.

2. Rotten pole replacement at Aquino St., Mabigo, Canlaon City

3. Vegetation clearing along Tagbino to Binalbagan line Section.

4. Hotspot correction and retightening of cutout terminals and junctions within the affected line section.

5. Installation of anti-tuko insulator and other preventive maintenance activity.
DATE POSTED: JANUARY 29, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 31, 2026 (SATURDAY)


8:00AM - 5:00PM


AREAS AFFECTED:
WHOLE COVERAGE AREA: MANJUYOD (Except Brgy. Panciao, Lukay, & Bala-as.)




1. Replacement of rotten pole backbone pole (C2) at Sundo-an, Manjuyod.

2. Clearing of backbone line from Bolisong to Alangilanan, Manjuyod.

3. Energize the new lateral line to serve RHU Building at Población, Manjuyod.

DATE POSTED: JANUARY 27, 2026


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 27, 2026 (TUESDAY)


12:00NN - 2:00 PM


EQUIPMENT AFFECTED: Calasgaan Primary Line Section


AREAS AFFECTED:
Portion of Brgy. Calasgaan, Bais
Brgy. Cambaguio, Bais
Brgy. Mansangaban, Bais
Brgy. Panam-angan, Bais




Replacement of a deteriorated primary pole that posed a safety risk to the public. The replacement was necessary to prevent potential accidents.
DATE POSTED: JANUARY 27, 2026


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 26, 2026 (MONDAY)


10:00 AM - 12:00 NN


EQUIPMENT AFFECTED: Brgy. Abis Primary Line Section


AREAS AFFECTED:
Brgy. Abis, Mabinay
Brgy. Bato, Mabinay
Brgy. Samac, Mabinay
Brgy. Pandanon, Mabinay
Brgy. Dahile, Mabinay
Brgy. Hagtu, Mabinay
Brgy. Mabato, Carol-an
Brgy. Kauswagan, Manjuyod
Sitio of Brgy. Nalundan, Abaca, Bayog, Pagsalayon, Kalatagan, Mantahao, Capipines




1. Emergency installation of a bayonet on C1 construction to correct the low vertical clearance of the service drop wire traversing the road.

2. Installation of a service pole to prevent hauler trucks from snagging the service drop wires.
DATE POSTED: JANUARY 26, 2026


Image from link NORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 25, 2026 (SUNDAY)


Start: 2:45PM End: 3:00PM ‎


EQUIPMENT AFFECTED: Bindoy Substation Feeder 1


AREAS AFFECTED:
Portions of brgy. Tinaogan, Brgy. Canluto, brgy. Danao Bindoy & whole brgys. Of Ayungon & Tayasan




Maintenence while replace one damage cut out assembly at Backbone line crossing Maaslum @Tampocon 1, Ayungon.
DATE POSTED: JANUARY 25, 2026


Image from link EMERGENCY POWER INTERRUPTION UPDATE
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 22, 2026 (THURSDAY)


5:31 AM


EQUIPMENT AFFECTED: Guihulngan Substation – Feeder 1 (Malusay Cutout)


AREAS AFFECTED:
Portions of Brgy. Malusay to Hilaitan, Guihulngan City




An emergency power shutdown was implemented to allow corrective work on detached primary lines at Bato, Brgy. Malusay, Guihulngan City. Power restoration will immediately follow upon completion of the necessary repairs.
DATE POSTED: JANUARY 21, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 13, 2026 (SATURDAY)


9:00 AM - 2:00 PM


EQUIPMENT AFFECTED: Bais City Line Section:


AREAS AFFECTED:
Laurel St., (From Corner Aglipay St., To Lto, Laurel St.),
Bais City District Hospital (3phase Line),
LTO Bais City,
Bais City National High School, Sbj Commercial, Sure Safe Vehicle Testing, Dialysis Bldg.




1. Line re-routing at united motoliance inc. At laurel st., bais city (ITM 1251).

2. Line clearing, pruning and other maintenance activities.
DATE POSTED: JANUARY 13, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 15, 2026 ( THURSDAY )


8:00 AM - 5:00 PM


EQUIPMENT AFFECTED: Guihulngan City Line Section:

AREAS AFFECTED: Brgy. Malusay from Adjao-Bato Malusay, Brgy. Calamba, Bulado, Basak, Hilaitan, Mani-Ak, Calupaan, Trinidad, Tacpao, Binobohan, Sandayao, Imelda




1.Relocation of utility poles affected by ongoing road widening operations in the Malusay-Calamba area.

2. Line Vegatation Clearing.

3. Other maintenance activities.
DATE POSTED: JANUARY 13, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 15, 2026 (THURSDAY)


10:00 AM - 5:00 PM


EQUIPMENT AFFECTED: Mabinay Line Section:

AREAS AFFECTED: Brgy. Tara, Mabinay,
Portion of Brgy. Campanun-An.




1. Line re-routing at Campanun-An provincial community high school at Brgy. Campanun-An, Mabinay. (ITM1240)

2. Line clearing and other maintenance activities
DATE POSTED: JANUARY 13, 2026


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


JANUARY 8, 2026 (THURSDAY)


10:00 AM - 1:00 PM


EQUIPMENT AFFECTED: Mabinay Line Section:

AREAS AFFECTED: Mabinay Spring Cottages, Portion of Purok 1, Mabinay




1. Installation of 1-25KVA transformer to serve Mabinay Central School (ITM1241 ).

2. Line clearing and other maintenance activities.
DATE POSTED: JANUARY 2, 2026


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 29, 2025 (MONDAY)


4:30 PM


EQUIPMENT AFFECTED: Vallehermoso Substation – Feeder 1

AREAS AFFECTED: From portions of Puan, Vallehermoso up to the entire coverage area of Canlaon City




A protection device detected a three-phase fault and automatically tripped. Due to heavy rain and strong winds, the maintenance team will conduct a line inspection once weather conditions improve. Power restoration will proceed immediately after the fault is identified and isolated.
DATE POSTED: JANUARY 2, 2026


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 29, 2025 (MONDAY)


8:30 AM - 9:30 AM


EQUIPMENT AFFECTED: Feeder 2 Recloser

AREAS AFFECTED: Tara, Campanun-an, Cambagahan, Bais, Pantao 1, Pantao 2, Dagbasan, Cansal-ing, Cangguhob, Lamdas, Lumbangan, Paniabonan, Bulwang, Mayaposi, Luyang, Panciao, Manjuyod, Cabcaban, Bindoy, Bagtic, Lucay, Manjuyod




1. Emergency replacement of a broken cross-arm in backbone line at Tadlong, Mabinay
DATE POSTED: DECEMBER 29, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 15, 2025 (MONDAY)


12:00 NN - 5:00 PM


EQUIPMENT AFFECTED: Proper Lamdas Primary Line Section

AREAS AFFECTED: Proper Lamdas, Mabinay
Cangguhob, Mabinay




1. Emergency replacement of a rotten primary pole at Lamdas, Mabinay. The pole was found to pose a safety risk, so it must be replaced immediately.

2. Correction of low vertical clearance on primary line.
DATE POSTED: DECEMBER 15, 2025


Image from link UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 12, 2025 (FRIDAY)


5:29 PM


EQUIPMENT AFFECTED: Feeder 1

AREAS AFFECTED: Portion of Poblacion Bais Brgy. 2
Brgy. Looc
Brgy. Okiot
Brgy. Capinahan
Brgy. Olympia
Brgy. Talungon
Brgy. San Isidro
Brgy. Tangculogan
Brgy. Binohon
Brgy. Valencia
Brgy. Katacgahan
Brgy. Tamisu
Brgy. Manlipac
Brgy. Tagpo
Portion of Riverside, Alangilanan
URSUMCO
City Treasurer Office
Mayor Office
S.P. Session Hall
Bais City District Hospital (50 kva transformer)




Unknown Fault. Maintenance is currently conducting a line patrol.
DATE POSTED: DECEMBER 12, 2025


Image from link NORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 12, 2025 (FRIDAY)


Start: 3:40
End : 3:50


EQUIPMENT AFFECTED: Bindoy Substation Feeder 2

AREAS AFFECTED: Bindoy (except Canluto, Danao, and cabcaban) and Manjuyod)




Emergency Shutdown
DATE POSTED: DECEMBER 12, 2025


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 14, 2025 (SUNDAY)


9:00 AM - 4:00 PM


Mabinay Line Section: Portion of Brgy. Tadlong, Napasuan, Bugnay, Poblacion Mabinay, Abis, Bato, Samac, Pandanon, Dahile, Hagtu, New Namangka, Old Namangka, Inapoy, Bulibulihan, Manlinggay, Banban, Arebasore, Barras.

Bindoy Line Section: Sitio of Brgy. Nalundan, Abaca, Bayog, Pagsalayon, Kalatagan, Mantahao, Capipines.

Ayungon Line Section: Brgy. Mabato, Carol-An.

Manjuyod Line Section: Brgy. Kauswagan




1. Installation of an intermediate pole on the backbone line to serve MR. DIY at Brgy. Poblacion, Mabinay (ITM1246)

2. Installation of 3-25KVA transformer to serve MR. DIY at Brgy. Poblacion, Mabinay.

3. Backbone line clearing and pruning.

4. Other maintenance activities.
DATE POSTED: DECEMBER 11, 2025


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 13, 2025 (SATURDAY)


9:00 AM TO 4:00 PM





9:00 AM TO 9:15 AM


Portion of Brgy. Cambuilao, Canlargo, Calasgaan, Cambaguio, Panam-Angan, Mansangaban.



Portion of Poblacion Bais City, Brgy. I, Brgy. Cambuilao, Canlargo, Calasgaan, Hangyad, Rosario, Tamogong, Basak, Cambaguio, Panam-Angan, Consolation, Mansangaban, Cambanjao, Lapaz, Cabanlutan, Dansulan, Panalaan, Mabunao, Sab-Ahan, Lonoy, Bais District Hospital (X-Ray), Bais City Hall, City Health Office, Hall Of Justice, Bais Evacuation Center, Metro Gaisano.




1. Replacement of Rotten Primary Pole.

2. Replacement of Deteriorated Insulators

3. Primary Line Clearing and Pruning

4. To safely isolate the disconnect switch at Cambuilao, Bais City.
DATE POSTED: DECEMBER 9, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 8, 2025 (MONDAY)


9:00 AM


EQUIPMENT: Kabudlisan Primary Line Section

AREAS AFFECTED: Sitio Kabudlisan, Bato, Mabinay




Emergency replacement of a rotten primary pole at Kabudlisan, Bato. The pole was found to pose a safety risk, so it must be replaced immediately.
DATE POSTED: DECEMBER 8, 2025


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 7, 2025 (SUNDAY)


5:00 AM - 7:00 AM (2HRS)


Mabinay Line Section: Portion of Brgy. Tadlong, Napasuan, Bugnay, Poblacion Mabinay, Abis, Bato, Samac, Pandanon, Dahile, Hagtu, New Namangka, Old Namangka, Inapoy, Bulibulihan, Manlinggay, Banban, Arebasore, Barras.

Bindoy Line Section: Sitio of Brgy. Nalundan, Abaca, Bayog, Pagsalayon, Kalatagan, Mantahao.

Ayungon Line Section: Brgy. Mabato, Carol-An.

Manjuyod Line Section: Brgy. Kauswagan




1. To allow for the safe installation of a 20-foot Christmas tree at the Mabinay Public Market, as requested by the LGU.
DATE POSTED: DECEMBER 5, 2025


Image from link NORECO 1 UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 4, 2025 (THURSDAY)


Start: 8:19 AM


EQUIPMENT AFFECTED: Bindoy Substation Feeder 2

‎ ‎AREAS AFFECTED: From Portions of Tinaogan and whole Brgys. of Bindoy except Canluto & Danao & whole brgys. of Manjuyod ‎




Unknown Fault. Maintenance is currently conducting line inspection/checking.
DATE POSTED: DECEMBER 4, 2025


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 9, 2025 (TUESDAY)


12:00 NOON - 5:00 PM


Mabinay Line Section:
Brgy. New Namangka
Brgy. Old Namangka
Brgy. Inapoy
Portion of North Poblacion.




1. Intermediate pole installation C/O Luz Pancho at Brgy. Old Namangka, Mabinay (ITM1230)

2. Line clearing and other maintenance activities.
DATE POSTED: DECEMBER 3, 2025


Image from link NORECO I EMERGENCY POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY


DECEMBER 3, 2025 (WEDNESDAY)


8:30 AM - 12:30 PM


Bais City Line Section:
Portion of Lower Tavera Corner National Highway
Portion of National Highway
Bais City. (From Uling Rooster to Batama Arcade) UCCP – BECESS




1. Replacement of busted sole use transformer serving po's marketing at national highway, Bais City (ITM 1237)
DATE POSTED: DECEMBER 2, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
DECEMBER 1, 2025 (MONDAY) 12:40 NN
Duration: 30 minutes
EQUIPMENT AFFECTED: Feeder 1 ‎

AREAS AFFECTED:
Portion of Poblacion Bais
Brgy. 2, Brgy. Looc, Brgy. Okiot, Brgy. Capinahan, Brgy. Olympia, Brgy. Talungon, Brgy. San Isidro, Brgy. Tangculogan, Brgy. Binohon, Brgy. Valencia, Brgy. Katacgahan, Brgy. Tamisu, Brgy. Manlipac, Brgy. Tagpo
Portion of Riverside, Alangilanan
Ursumco
Reinforced cut Primary Hotline Jumper at Obreros, Bais
DATE POSTED: NOVEMBER 26, 2025


Image from link NORECO I SCHEDULED POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 29, 2025 (SATURDAY) 7:00AM - 5:00PM Bais City Line Section:
Portion of Poblacion, Brgy. Ii, Looc, Okiot, Capiñahan, Talungon, Biñohan, Valencia, Katacgahan, Tamisu, Manlipac, Tagpo, Ursumco, Bais City District Hospital, City Treasurer Office, Mayor Office, S.P Session Hall, Bais City Evacuation Center.

Portion of Riverside Alangilanan, Manjuyod.
1. Installation of primary assembly renovation and pole relocation C/O United Motoliance Ata Brgy. Talungon, Bais City. (ITM1234)

2. Replacement of busted transformer unit serving pos marketing (15KVA TO 25KVA).

3. Line Clearing Activities.

4. Other Maintenance Activities
DATE POSTED: NOVEMBER 26, 2025


Image from link NORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 24, 2025(MONDAY) 7:12AM - 12:00PM EQUIPMENT AFFECTED: Vallehermoso Substation Feeder 1 & Feeder 2 ‎

AREAS AFFECTED:
A portion of Barangay Hibaiyo, Guihulngan City, and the entire areas of Vallehermoso and Canlaon City.
Troubleshooting of Vallehermoso Substation switchgear.
DATE POSTED: NOVEMBER 24, 2025


Image from link NORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 23, 2025 (SUNDAY) 1:00PM - 4:00PM EQUIPMENT AFFECTED: Guihulngan Substation
Feeder 1, Phase ABC

AREAS AFFECTED:
Portions of Barangay Poblacion
Brgy. Malusay, Brgy. Buenavista, Brgy. T-Hill, Brgy. Mabunga, Brgy. Magsaysay, Brgy. Nagsaha, Brgy. Villegas, Brgy. Planas, Brgy. Humay-humay, Brgy. Balogo, Brgy. Banwage, Brgy. Plagatasanon, Brgy. Linantuyan, Brgy. Luz, Brgy. Hinakpan, Brgy. Calamba, Brgy. Bulado, Brgy. Binobohan, Brgy. Tacpao, Brgy. Sandayao, Brgy. Imelda, Brgy. Basak, Brgy. Hilaitan, Brgy. Mani-ak, Brgy. Calupaan, Brgy. Trinidad, Portion of Brgy. Hibaiyo
Correction and upgrading of backbone line poles at Brgy. Poblacion, Guihulngan City.

Other Parallel Activities:
1. Installation of a three-phase line at Kingco, Guihulngan
2. Installation of transformers at Guihulngan Hospital.

Restoration: Power will be restored right after the work is completed.
DATE POSTED: NOVEMBER 23, 2025


Image from link NORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 19, 2025 (WEDNESDAY) 12:00 NN - 1:00 PM EQUIPMENT AFFECTED: Bindoy Substation Feeder 1 ‎

AREAS AFFECTED:
Portions of brgy. Tinaogan, Brgy. Canluto, brgy. Danao Bindoy & whole brgys. of Ayungon & Tayasan
Correction of Hotspot
DATE POSTED: NOVEMBER 19, 2025


Image from link NORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 12, 2025 (WEDNESDAY) 6:00AM - 7:00AM EQUIPMENT AFFECTED: Bindoy Substation Feeder 1 ‎

AREAS AFFECTED:
Portions of of Ayungon (Awa-an, Kilaban & Iniban) & Portions of Tayasan (Tamao, Matu-og, Soquib, Numnum, Palaslan, Ilaya, Poblacion, Cabulotan, Magtuhao, Matauta, Banga, Maglihe, Saying, Bacong, Lutay & Sta. Cruz)
Switching of power of the affected areas from Guihulngan Feeder 2 back to Bindoy Feeder 1

‎‎REMARKS: There will be a brief interruption affecting the Portions of Guihulngan (Portions of Poblacion, T.Beach, Kagawasan, Bakid, McKinley & P.Zamora) & the entire Jimalalud & La Libertad areas lasting for about 5 mins. The interruption is necessary to safely isolate power at Bae, Jimalalud.
DATE POSTED: NOVEMBER 12, 2025


Image from link NGCP UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 9, 2025 (SUNDAY) 10:10 AM EQUIPMENT AFFECTED: Vallehermoso and Guihulngan Substation ‎

AREAS AFFECTED:
Canlaon City, Vallehermoso, Guihulngan City, La Libertad, Jimalalud
Fault is still unknown. We are still reaching out to NGCP for the possible cause of the power outage.
DATE POSTED: NOVEMBER 9, 2025


Image from link NGCP UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 9, 2025 (SUNDAY) 1:22 AM EQUIPMENT AFFECTED: Vallehermoso and Guihulngan Substation ‎

AREAS AFFECTED:
Canlaon City, Vallehermoso, Guihulngan City, La Libertad, Jimalalud
Fault is still unknown. We are still reaching out to NGCP for the possible cause of the power outage.
DATE POSTED: NOVEMBER 9, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 8, 2025 (SATURDAY) 10:20 AM
Duration: 30 minutes
EQUIPMENT AFFECTED: Feeder 1 ‎

AREAS AFFECTED:
Portion of Poblacion Bais
Brgy. 2, Brgy. Looc, Brgy. Okiot, Brgy. Capinahan, Brgy. Olympia, Brgy. Talungon, Brgy. San Isidro, Brgy. Tangculogan, Brgy. Binohon, Brgy. Valencia, Brgy. Katacgahan, Brgy. Tamisu, Brgy. Manlipac, Brgy. Tagpo, Portion of Riverside, Alangilanan, Ursumco, City Treasurer Office, Mayor Office, S.P. Session Hall, Bais City District Hospital
Emergency installation of insulator at Juan Luna St. Upon assessment, it was found to be the cause of the power interruption, which bypassed the substation and resulted in the tripping of Feeder 1 earlier.
DATE POSTED: NOVEMBER 8, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 7, 2025 (FRIDAY) 12:00 PM - 1:00PM EQUIPMENT AFFECTED: Vallehermoso Substation Feeder 1 & Feeder 2 ‎

AREAS AFFECTED:
A portion of Barangay Hibaiyo, Guihulngan City, and the entire areas of Vallehermoso and Canlaon City.
Troubleshooting of Vallehermoso Substation switchgear.
DATE POSTED: NOVEMBER 7, 2025


Image from link NORECO I EMERGENCY POWER SERVICE INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 9, 2025 (SUNDAY) 8:00 AM - 5:00 PM AREAS AFFECTED:
Whole Coverage Area of Bais City (Except Brgy. Cambagahan)
1. HOM-COR requested for power interruption to perform the programming and activation of the auto-reclosing function of the multi-feeder protection relay.

2. Parallel maintenance activities.
DATE POSTED: NOVEMBER 5, 2025


Image from link NORECO 1 POWER INTERRUPTION UPDATES
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 5, 2025 (WEDNESDAY) 6:57 PM EQUIPMENT AFFECTED: Bindoy Substation Feeder 1 REMARKS: Power has been restored in the highway-tapped sitios of Tampocon 1, Tampocon 2, and Poblacion, Ayungon at 6:41PM. Moreover, power has also been restored in the highway-tapped sitios of Sta. Cruz, Lutay, Cabulotan, Poblacion, Palaslan, Matuog, and Tamao, Tayasan, as well as in the highway-tapped sitios of Iniban and Awa-an, Ayungon, at around 12:06 AM early in the morning today.
DATE POSTED: NOVEMBER 5, 2025


Image from link NGCP UNSCHEDULED POWER INTERRUPTION UPDATES
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 4, 2025 (TUESDAY) 5:30 PM ‎ EQUIPMENT AFFECTED: Feeder 1 & Feeder 2 of Vallehermoso & Guihulngan Substations ‎

AREAS AFFECTED:
Canlaon City, Vallehermoso, Guihulngan City, La Libertad & Jimalalud
UPDATE: The cause of the interruption is still unknown. NGCP’s maintenance team is currently conducting a line inspection. They have attempted several times to close the PCB control, but have been unsuccessful so far.
DATE POSTED: NOVEMBER 4, 2025


Image from link NGCP UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 4, 2025 (TUESDAY) 7:30 AM EQUIPMENT AFFECTED: Feeder 1 & 2 of Vallehermoso, Guihulngan, Bindoy & Bais Substation ‎

AREAS AFFECTED:
Canlaon City, Vallehermoso, Guihulngan City, La Libertad, Jimalalud, Tayasan, Ayungon, Bindoy, Manjuyod & Bais City ‎
Fault is still unknown. We are still reaching out to NGCP for the possible cause of the power outage.
DATE POSTED: NOVEMBER 4, 2025


Image from link NORECO 1 UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 3, 2025 (MONDAY) 1:00 PM EQUIPMENT AFFECTED: Bindoy Substation Feeder 1‎

AREAS AFFECTED:
Portions of brgy. Tinaogan, Brgy. Canluto, brgy. Danao Bindoy & whole brgys. of Ayungon & Tayasan
Fault is still unknown. Maintenence is currently conducting line inspection but due to the weather condition, there will be delays in restoration of power as we are considering the safety of our linemen.
DATE POSTED: NOVEMBER 3, 2025


Image from link NGCP POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 1, 2025 (SATURDAY) 7:26 PM EQUIPMENT AFFECTED: Vallehermoso and Guihulngan Substation ‎

AREAS AFFECTED:
Canlaon City
Vallehermoso
Guihulngan City
Lalibertad
Jimalalud
Fault is still unknown. We are still reaching to NGCP for the possible cause of the power outage.
DATE POSTED: NOVEMBER 1, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 31, 2025 (FRIDAY) 8:00 AM - 5:00 PM EQUIPMENT AFFECTED: Praxevilla Primary Line Section‎

AREAS AFFECTED:
Sitio Nalandan, Tagpo
Sitio Hinugtan, Tamisu
Sitio Ludgod, Tamisu
Sitio Camagbaan, Tamisu
Sitio Camanggahan, Tamisu
BAPA Camanggahan requested a power interruption to facilitate their line clearing activities due to multiple obstructions along the line, and to ensure safety during the work.
DATE POSTED: OCTOBER 31, 2025


Image from link NORECO I SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
NOVEMBER 2, 2025 (SUNDAY) 8:00 AM - 12:00 NOON AREAS AFFECTED: Manjuyod Line Section :

*Riverside, Alangilanan, Manjuyod *URSUMCO
1. NORECO and URSUMCO personnel will conduct hotspot correction inside URSUMCO'S premises.
DATE POSTED: OCTOBER 30, 2025


Image from link ‎NORECO 1 UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 28, 2025 (TUESDAY) 4:23 PM EQUIPMENT AFFECTED: Bindoy Substation Feeder 1 ‎

AREAS AFFECTED: Portions of Brgy. Tinaogan, Brgy. Canluto, brgy. Danao Bindoy & whole Brgys. of Ayungon & Tayasan
Fault is still unknown. Maintenence is currently conducting line checking/inspection.
DATE POSTED: OCTOBER 28, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 27, 2025 (MONDAY) 5:45PM - 6:45PM EQUIPMENT AFFECTED: Feeder 2 Vallehermoso Substation

AREAS AFFECTED: From portion of Brgy. Puan, Malangsa, Tabon, Don E. Villegas, Molobolo. Portion of Brgy Hibaiyo.
Repair of Cut Conductor at Brgy. Tabon
DATE POSTED: OCTOBER 27, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS OF NORECO 1 SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 25, 2025 (SATURDAY) 7:00 AM - 6:00 PM Mabinay Line Section: Brgy. Bato, Abis, Samac, Pandanon, Dahile, Hagtu.

Manjuyod Line Section: Brgy. Kauswagan

Ayungon Line Section: Brgy. Mabato
1. Pole relocation due to road widening C/O Mt. Binai at Brgy. Abis, Mabinay (ITM1219)

2. Line clearing and other maintenance activities.
DATE POSTED: OCTOBER 21, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS OF NORECO 1 SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 24, 2025 (FRIDAY) 9:00AM - 5:00PM Mabinay Line Section: Brgy. Tara, Brgy. Cambagahan, Brgy. Campanun-An 1. Replacement of rotten pole

2. Line clearing

3. Other preventive maintenance activities
DATE POSTED: OCTOBER 21, 2025


Image from link NORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 21, 2025 (TUESDAY) ‎ 12:00PM ‎- 12:30PM EQUIPMENT AFFECTED: Bindoy Substation Feeder 2

AREAS AFFECTED: From portions of Tinaogan & whole brgys. Bindoy (except Canluto & Danao) & whole Brgys. Manjuyod
Maintenance will replace one broken Disconnect switch of Bindoy Feeder 2
DATE POSTED: OCTOBER 21, 2025


Image from linkNORECO 1 EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 20, 2025 (MONDAY) 9:55PM - 10:55PM EQUIPMENT AFFECTED: Bindoy Substation Feeder 2

AREAS AFFECTED: Whole brgys. of Manjuyod
Maintenance will conduct removal of broken branch of mango tree that was fallen on the backbone line at Sundo-an Manjuyod. Also, they will make the necessary replacement of pole accessories that was damage/hit by the said branch of tree.
DATE POSTED: OCTOBER 20, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS OF NORECO 1 SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 21, 2025 (TUESDAY) 8:00 AM - 5:00PM Line Section Barangay, Mabunga, Guiihulngan City 1. Relocation of Poles PER ITM 1229

2. Line Clearing & Maintenance Activities
DATE POSTED: OCTOBER 16, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS OF NORECO 1 SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 16, 2025 (THURSDAY) 12:00NOON - 2:00PM Canlaon City Line Section:

Uptown Mabigo,
Alibabay, Mabigo,
Gaboc Malaiba,
Compound Malaiba,
Villa Iowa Pula,
Compound Pula.
1. Installation of intermediate pole with transformer and assemblies.

2. Other line maintenance activity
DATE POSTED: OCTOBER 14, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS NGCP SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 19, 2025 (SATURDAY) 6:00AM - 6:00PM Bais City, Manjuyod, Bindoy, Ayungon, Tayasan, Jimalalud, La Libertad, Guihulngan City, Vallehermoso, Canlaon City. 1. Conduct re-connection of the line dropper conductor for the temporary bypass of Bindoy switching station.

2. Conduct wood pole replacement and other transmission line correction works along the Amlan-San Carlos 69KV Line.

3. Conduct energization of the newly installed/replaced PCB at Bindoy Switching Station.
DATE POSTED: OCTOBER 14, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 13, 2025 (MONDAY) 9:30 AM - 11:30AM EQUIPMENT AFFECTED: Distribution Transformer

AREAS AFFECTED: Portion of Aglipay St., Portion of Roxas St., Portion of Upper Burgos St.
1. Installation of 1-37.5 Kva transformer to serve Rizal Bank, Inc. at Brgy. 1, Bais City (ITM1205)

2. Hotspot Correction
DATE POSTED: OCTOBER 13, 2025


Image from link EMERGENCY POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 10, 2025 (FRIDAY) 3:00PM - 4:00PM EQUIPMENT AFFECTED: Feeder 2 Recloser

AREAS AFFECTED: Tara, Campanun-an, Cambagahan, Bais, Pantao 1, Pantao 2, Dagbasan, Cansal-ing, Cangguhob, Lamdas, Lumbangan, Paniabonan, Bulwang, Mayaposi, Luyang, Panciao, Manjuyod Cabcaban, Bindoy, Bagtic,Lucay, Manjuyod
1. To tap the service connection of Seven Eleven to the primary line at Lumbangan, Mabinay

2. Hotspot correction in the primary line along Lumbangan, Mabinay
DATE POSTED: OCTOBER 10, 2025


Image from link NGCP UNSCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 7, 2025 (TUESDAY) Start: 04:59 PM EQUIPMENT AFFECTED: Feeder 1 & 2 of Vallehermoso, Guihulngan, Bindoy & Bais Substation

AREAS AFFECTED: Canlaon City, Vallehermoso, Guihulngan City, La Libertad, Jimalalud, Tayasan, Ayungon, Bindoy, Manjuyod & Bais City
Fault is still unknown. We are still reaching to NGCP for the possible cause of the power outage.
DATE POSTED: OCTOBER 7, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS OF NORECO 1 SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 11, 2025 (SATURDAY) 8:00AM TO 5:00PM Guihulngan City Line Section: Brgy. Malusay from Adjao-Bato Malusay, Calamba, Bulado, Basak, Hilaitan, Mani-ak, Calupaan, Trinidad, Tacpao, Binobohan, Sandayao, Imelda. 1. Relocation of utility poles affected by ongoing road widening operations in the Malusay-Calamba Area.

2. Line Vegetation Clearing

3. Other Line Maintenance Activity
DATE POSTED: OCTOBER 7, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS OF NORECO 1 SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 11, 2025 (SATURDAY) 7:00AM TO 5:00PM Mabinay Line Section:
Portion Of Tadlong, Napasu--An, Bugnay, Poblacion Mabinay, Abis, Bato, Samac, Pandanon, Dahile, Hagtu, New Namangka, Old Namangka, Inapoy, Bulibulihan, Manlingay, Banban, Arebasore, Barras

Manjuyod Line Section: Brgy. Kauswagan

Bindoy Line Section: Brgy. Capipines

Ayungon Line Section: Brgy. Mabato

Tayasan Line Section Only: Brgy. Tambulan, Cambaye, Dalaupon, Jilabangan, Pinocawan, Linao, Pinalubngan, Guincalaban, Lag-It, Bago, Pindahan, Tanglad.
1. Pole relocation due to road widening C/O Mt. Binai at Brgy. Tadlong, Mabinay (ITM1220)

2. Line clearing and other maintenance activities.
DATE POSTED: OCTOBER 7, 2025


Image from link TO ALL MEMBER-CONSUMER-OWNERS OF NORECO 1 SCHEDULED POWER INTERRUPTION
DATE TIME AFFECTED AREA REASON / ACTIVITY
OCTOBER 4, 2025 (SATURDAY) 8:00AM - 5:00PM Whole Coverage Area Of: Ayungon - All Barangays (Except Brgy. Mabato & Carol-An) Tayasan: Brgy. Tambulan, Dalaupon, Jilabangan, Linao, Pinocawan, Pinalubngan, Guincalaban, Lag-It, Bago, Pindahan, Tanglad. 1. Urgent replacement of rotten backbone pole inside DENR compound at Tiguib, Ayungon.

2. Maintenance will conduct line vegetation clearing at Brgy. Maaslum to Tibyawan Backbone Line
DATE POSTED: OCTOBER 1, 2025

Let's Talk

Contact Us

noreco1@yahoo.com

Tinaogan, Bindoy, Negros Oriental

Official Seal

Copyright © 2025 Sparkon, All rights reserved. Powered by CORPORATE PLANNING DEPARTMENT - ICT

Scroll to Top